The quote is on the table. There’s a second one beside it, several thousand less for what sounds like the same kitchen. And the homeowner is looking at ours, wondering what we’re hiding.
Plainly? The difference is almost never the units, and almost never greed. It’s the paragraph of work nobody itemises: what was under the old floor, what the walls were like, where the water and waste had to go, where the cable had to come from, and who was taking the old kitchen away.
That’s where kitchen fitting cost can be hard to judge from a total alone. Two quotes can look like they cover the same room, while one includes all the work behind the cabinets and the other leaves some of it for later.
The units are the easy bit.
A kitchen is not a furniture delivery. Cabinets arrive in flat boxes on a lorry, and a competent fitter can hang them in a couple of days. But the cabinets are only one part of the job. The rest is the room itself.
The floor needs to be flat enough. The walls need to be straight enough. Power has to reach the oven in its new home, and the water has to get in while the waste gets out with a fall that actually works. If those things need attention, they take time and skill. That is where the days go, and where the money goes.
A lovely door finish won’t level a floor or sort a waste pipe. The tidy result you see at the end depends on all the less glamorous work being done properly first.
There’s also one decision you can’t fudge later, and that’s the worktop. It gets templated once the units are level and screwed to the wall, so the depth, the overhang and exactly where the sink lands are all settled by then. Choose it early, not on the morning the fitter asks you what you want.
The five things that decide the price in a Farnborough house.
First, the floor. What’s down already: quarry tiles on screed, vinyl glued to hardboard, or chipboard that’s had a slow leak under the sink for years? Levelling it, or lifting it and starting again, changes the job before anything is fitted. Leave a wonky floor and it can show up later as a worktop joint that opens or doors that rub. Not the sort of detail you want to discover after the new kitchen is in.
Then there are the walls. Plaster might crumble when a socket is chased. An old chimney breast may need boxing in or removing. Plasterboard can hide a pipe exactly where the new cabinet needs to sit, and sometimes there’s a cupboard built around a boiler nobody has moved since. Each one calls for a different bit of making good, carpentry or service work.
The services matter too. Moving a sink isn’t one job, it’s four: hot water, cold water, the waste pipe, and getting that waste away with enough fall. A moved hob needs a gas connection done properly by a Gas Safe registered engineer, or a new circuit for induction. Then we need to look at the fuse board, the oven supply and whether the sockets in the old kitchen are enough for the new layout. More appliances, more considered electrical planning. And check the sizes before the units are ordered rather than after: a fridge two centimetres too wide for its gap is a very expensive two centimetres.

The extract is easy to underestimate. A recirculating filter is a compromise, and everybody knows it: it filters air through the hood but doesn’t send it outside. Ducting through an outside wall, or up through a ceiling void, is a real job with a real cost attached. It’s also the thing people sometimes cut, then regret when cooking smells and moisture hang around. We bang on about ventilation in every room; we’ve made the same point in our Farnborough bathroom extractor guide.
And then there are the awkward bits. Pipework to box in behind a run of units. A stop tap buried under the old cabinets that needs finding and making accessible. A joist notched to death by a previous trade, or a door that won’t clear the new floor. Each one sounds small on its own. Together, they can be a day’s work.
Where people overspend, and where they shouldn't.
It’s natural to spend on what visitors can see: the worktop, the appliance badge, the glossy finish. But nobody ever stood in a kitchen and admired the drawer runners. And yet a full-extension drawer that still runs sweet in eight years can be worth more to you every day than a worktop upgrade.
Lighting is another common regret we hear about. One pendant in the middle of the ceiling leaves the worktop in shadow just where you’re chopping. Layers of light make more sense: general light for the room, then task lighting under the cabinets and over the places you actually work. That can change the feel and usefulness of the room more than upgrading the worktop.
And keep something back for surprises. There’s usually at least one; the ones that hurt most are the ones found after the units are on the wall. A little room in the plan for the unknown is more useful than spending every last bit on the visible finish.
Why the cheap quote is cheap, and how to read it.
The lower number may be a real number. It may just be an incomplete one. The question that settles it is simple: what’s excluded?
Ask whether making good after the electrics is included, and whether plastering and tiling are covered. Is removing the old kitchen and taking away the waste included? Who makes good around the new floor? Who certifies the electrical work? If the sink moves, are the water and waste alterations included? And has the worktop been properly templated, or is it being cut on site?
Those details aren’t fussy extras. They’re part of understanding what each quote actually covers. A fitter who won’t put them in writing isn’t being modest with the price; they’re leaving you to find out later. The Federation of Master Builders has sensible guidance on comparing quotes and vetting a builder. Compare what each quote includes, not just the total at the bottom.
What we do before we price a kitchen.
We measure the room properly. If there’s a way in, we look under the floor and behind the old units. We check the fuse board, trace where the waste actually goes, and look at the boiler and stop tap. A kitchen sink that has to pump its waste uphill is a problem we’d rather spot now than after the cabinets are fitted.
Then we ask how you cook. Not just what appliances you want, but how you use the room on a normal day. Do you need clear space beside the hob? Is more than one person usually preparing food? That answer can change the layout more than any drawing does.
Only then does a number mean anything. If you’re still deciding whether the kitchen needs replacing at all, start here with our honest checklist for Farnborough homeowners. And if you’re after kitchen fitters in Farnborough, our kitchen supply-and-fit service is where the details of what we do live.
The honest timeline, and the mess.
The room gets emptied, and then it gets worse before it gets better. First fix, plaster, units, a worktop template and then the wait for it to come back, tiling, second fix and snagging. It’s a sequence, not a magic overnight change.
For a stretch there’s no sink, so washing up happens in the bathroom or the kettle moves into the lounge. Dust gets everywhere, no matter how many dust sheets and zipped doors go up. Anyone who tells you otherwise hasn’t done many kitchens.

We’ll do what we can to keep the work area managed, but it’s still disruption in the heart of your home. The honest trade-off is a fortnight of inconvenience against fifteen years of a room that works better every day.
We fit kitchens across Aldershot, Farnborough, Farnham, Guildford and surrounding areas. Book a visit at a time that works, and we’ll measure, look at what’s behind the old units, and price the whole job honestly, including the bits nobody wants to talk about.